Stock & drying
Okume plywood and hardwood in, moisture checked, turned on the rack before cutting.
Nothing is subcontracted out of sight. A pool table moves through eight stations in one building, from plywood on the rack to cartons in a container, and you can stand at any of them on a working day.
Okume plywood and hardwood in, moisture checked, turned on the rack before cutting.
Aprons, beams and panels off one program, so part 400 matches part 1.
Blanks sized on the panel saw, cushion seat and sight line cut on the spindle.
Beams drilled and bolted, corners fitted, the frame squared on the bench.
Primer sprayed and racked, then PU coats built up with a cure between each.
Premier rubber bonded to the rail, rebound checked, cloth stretched by hand.
Slate laid, levelled and rolled, signed off, then broken down for packing.
Parts boxed by component, crated, stencilled and loaded on our own yard.




One hundred and five seconds shot on ordinary working days: stock, machines, parts, packing, loading and assembly. No music, no stock footage.
My father started this workshop and I grew up in it. I run it now. If you send a drawing, I am the one who reads it; if you fly in, I walk you round the floor myself. That is why we can quote the factory's number instead of a brand's.
Andrew Tran, owner, Quan Phong International Co., Ltd
About 300 tables a month on 2,000 m² of floor.
Okume plywood with E1 glue for panels and beams, hardwood for rails, and solid American oak as a rail option.
Yes. Crates use ISPM 15 heat-treated timber, stencilled in our own yard.
Send quantity, sizes and finish. You get a price and a loading plan back within one working day, from the owner, not a sales desk.